Skip to content

Asbestos Floor Tile Removal in Guildford

Nine inch mottled tiles, usually hiding under a carpet somebody laid in 1994. Non-licensed work, and cheaper than most people fear until the adhesive gets involved.

  • Non-licensed work, carried out directly
  • Tiles lifted whole rather than broken up
  • Bitumen adhesive priced separately and honestly
01483 363302

Send a photo, get a price

Most enquiries get an indicative price the same day. No visit needed to start.

What we do with your details is set out in the privacy policy.

Indicative price
£15 to £30
per square metre
Category of work
Non-licensed
carried out directly, condition permitting
How common
Regular work
across Guildford and Surrey
An operative in a coverall and half-mask respirator damping down debris inside a building stripped back to its timber frame.
On this page

Thermoplastic floor tiles are the asbestos material people find rather than notice.

They turn up when a carpet comes up, when a kitchen is stripped out, when a leak means a floor has to be lifted. Hard, brittle, usually nine inches square, in a mottled brown, black, green or red that was fashionable for about thirty years and has been under something else ever since.

Recognising them

Size first. Nine inch squares, which is 229mm, laid tight with almost no joint. That dimension is the strongest single clue, because it belongs to a particular era of British flooring.

Then the material. They are hard and slightly brittle rather than flexible. Lift one at the corner with a scraper and it snaps rather than bending, which modern vinyl does not do. The colour is mottled and marbled through the thickness rather than printed on the surface.

Then what is under them. A black, tarry adhesive is the classic bedding for these tiles, and it frequently contains asbestos in its own right. That is worth knowing before anyone starts, because it changes the scope.

Where they are is a clue too. Kitchens, hallways, utility rooms, downstairs toilets and garages. Anywhere that needed a hard-wearing floor in a 1960s house.

Colour tells you nothing about asbestos content, and neither does condition. A sample and lab test is the only certainty, and because the tiles and the adhesive are two different materials, both should be tested.

What it costs

£15 to £30 per square metre, indicative. That makes tile removal one of the cheaper asbestos jobs per square metre, and considerably cheaper than a textured ceiling.

The variable is the adhesive, not the tiles.

Tiles laid on a clean screed with a thin bitumen bed lift with heat and a scraper, and the job sits at the lower end. Tiles bedded in thick black adhesive that has to be taken back to bare screed sit at the top, because scraping glue is slow and the glue is often the asbestos-containing part.

Three other things move it. One open room is quicker than a warren of small spaces with skirtings and door thresholds. Tiles already broken by whoever lifted the carpet cost more than intact ones. And anything heavy that has to come out first is time.

Disposal is by weight at £0.55 to £0.80 per kilogram. Tiles are dense but a domestic floor is not a large tonnage, so disposal is rarely the dominant line here in the way it is on a roof.

The full ranges are on the cost page.

Lift them, or cover them?

Both are legitimate and the right answer depends on what is going on top.

Cover them. Sound tiles that are firmly stuck down and are about to disappear under a new floor are low risk. Covering is a recognised way of managing asbestos and it costs almost nothing. Two conditions apply and they are not optional. Nothing gets sanded, ground, drilled or scraped in the process. And you write down what is under there, so the next person who lifts that floor finds out before they start rather than afterwards.

Lift them. The right answer where the floor level matters, where the screed has to be exposed for underfloor heating or a damp-proof membrane, where the tiles are already broken or lifting, or where you simply want the material gone.

The most common mistake sits between the two. Somebody decides to cover, then discovers the new floor needs the level dropping, and a fitter takes a grinder to the tiles at the doorway. That is the moment a managed material becomes an exposure.

The method

Heat and patience, not force.

Cold tiles snap. Warmed tiles release from the adhesive and come up whole, and whole tiles produce almost no dust. A hot air gun or an infrared plate softens the bed, and each tile is eased up rather than levered against its neighbour.

The area is sheeted and the room is kept damp. Tiles go straight into bags rather than into a pile. Anything that does break gets bagged immediately rather than swept later.

Adhesive is dealt with separately, and how far it comes back depends on what you asked for. Scraped to bare screed, taken back to a sound residue, or sealed in place under a floor primer. Each of those is a different price and each should be on the quote.

Then the clean, with a filtered vacuum rather than a domestic one, along the skirtings and into the corners where fragments collect.

The adhesive, in more detail

The black glue deserves more than a mention, because it is where most of the cost and most of the confusion sits.

Bitumen adhesive was the standard bedding for thermoplastic tiles and it frequently contains asbestos itself. That means lifting the tiles and leaving a black film on the screed has not necessarily removed the asbestos from the room. It has removed some of it.

Three ways to finish, and each is a different price.

Seal it. A proprietary primer or encapsulant over the residue, then the new floor on top. Cheapest by a distance, entirely legitimate where the new covering is going straight down, and it goes on the record for whoever lifts the floor next.

Take it back to a residue. Mechanical scraping while damp, removing the bulk and leaving a thin stained layer bonded to the screed. This is the usual middle path where a levelling compound is going on.

Take it back to bare screed. Slow, and the only option where the level has to drop, where underfloor heating is going in, or where a damp-proof membrane has to bond directly to the slab.

What is never acceptable is a floor grinder or a sander on asbestos-containing adhesive. That is dry abrasion of a friable material in an enclosed room, and it is the single worst thing anyone does to this material.

Garage and outbuilding floors

Worth a separate note because the tiles turn up outside the house too.

Nine inch tiles were laid in garages, workshops and outbuildings as often as in kitchens, usually straight onto a concrete slab. They tend to be in worse condition, because a garage floor takes tyres, jacks, dropped tools and damp coming up through the slab.

The complication is that a garage floor with tiles frequently sits under a garage with a cement sheet roof. Two asbestos materials, two categories, one building. Quoting them together is cheaper than two visits, and it also means the sequencing is right: the roof comes off first, from outside, before anyone is working at floor level underneath it.

Guildford floors

The tiles are in the same houses as everything else from that period, but the trigger is different.

Almost every enquiry we get about floor tiles arrives because of building work rather than because somebody was worried. A kitchen being replaced in a 1960s semi in Burpham. A hallway floor lifted in a Bellfields terrace after a washing machine leak. A downstairs toilet being converted in a Merrow bungalow.

That is worth planning around. The tiles are usually the cheapest part of the job and the most disruptive to discover halfway through, because a kitchen fit that stops for a fortnight while somebody arranges a lab test costs far more than the tile removal itself. If you are having work done to a pre-2000 floor, get the tiles identified during planning rather than during demolition.

We cover Guildford and the surrounding towns. The areas we cover page lists each one, along with what the local waste rules are.

Free, no obligation

Not sure what you are looking at?

Send a photo and a postcode. You get an indicative price back, usually the same day, and a straight answer on whether it is licensed work.

Straight answers

Common questions

How much does asbestos floor tile removal cost?

£15 to £30 per square metre, indicative, which makes it one of the cheaper asbestos jobs by area. The position within that range is decided almost entirely by the adhesive. Tiles that lift cleanly off a screed sit at the bottom. Tiles bedded in black bitumen that has to be scraped back sit at the top, because the glue is slower to remove than the tiles and it usually contains asbestos as well.

Are nine inch tiles always asbestos?

Not always, but the size is a strong signal. Thermoplastic tiles were produced in nine inch squares through the 1950s to the 1970s and most of those contained asbestos, typically at a low percentage bound into the tile. Twelve inch vinyl tiles are more likely to be later and asbestos-free, though vinyl asbestos tile exists too. Colour is no guide at all. A sample and lab test is the only way to be sure.

Is the black glue underneath asbestos as well?

Very often yes, and it is the part people miss. Black bitumen adhesive used to bed these tiles frequently contains asbestos in its own right. That matters because lifting the tiles and leaving the glue does not finish the job. If a new floor is going down over the top, sealing the adhesive in place is a legitimate option and it is cheaper than scraping. If the screed has to be exposed, the glue has to come off too.

Can I just lay laminate over the top?

In many cases yes, and it is a reasonable answer. Sound tiles that are firmly stuck down and are going to be covered rather than disturbed present very little risk, and covering them is a recognised way of managing the material. Two conditions. Nothing gets sanded, drilled or scraped in the process, and you record what is under there so the next person to lift the floor knows what they are dealing with.

Is this licensed work?

No. HSE names asbestos-containing thermoplastic and vinyl floor tiles in its non-licensed work category, and it is work we carry out directly. That does not mean it needs no controls. Tiles are brittle, they break when they are levered cold, and breaking them is what puts fibres into the air. Heat, patience and whole tiles are the method.

We are having a new kitchen fitted and found tiles underneath. What now?

Stop and photograph them before anyone lifts more. A kitchen fit involves exactly the activities that cause a problem here, including levering units out, drilling the floor and running a multi-tool along the skirting. Identify the tiles first. If they are asbestos, either lift them properly as part of the programme or cover and record them, but do not let a fitter break them up around the edges to get a run of units in.

Keep reading

Related work

Get a price for asbestos floor tile removal

A photo and a postcode is enough to start. You get an indicative range back, usually the same day.

What we do with your details is set out in the privacy policy.