Skip to content

Asbestos Roof Removal in Guildford

Larger cement roofs on workshops, extensions, stables and lean-tos. Priced by area rather than per building, with access and scaffolding costed before anyone starts.

  • Priced per square metre once the area is known
  • Scaffolding quoted up front, never added later
  • Roof stripped in sections so the building stays weathertight
01483 363302

Send a photo, get a price

Most enquiries get an indicative price the same day. No visit needed to start.

What we do with your details is set out in the privacy policy.

Indicative price
Around £50
per square metre, indicative
Category of work
Non-licensed
carried out directly, condition permitting
How common
Regular work
across Guildford and Surrey
Four operatives in coveralls and powered respirators stripping asbestos cement slates from a pitched house roof, working off scaffolding with the stripped area sheeted over.
On this page

Not every asbestos roof is a garage. A lot of the enquiries we get are for buildings that fall between a shed and an industrial unit: a workshop at the bottom of a yard, a flat-roofed extension, a stable block, a lean-to along the side of a house, a run of outbuildings behind a shop.

They have one thing in common. They are big enough that per-building pricing stops making sense and area pricing takes over.

How area pricing works

Asbestos cement removal is roughly £50 per square metre, indicative, once the roof is bigger than a single garage. Measure the roof area rather than the footprint, because a pitched roof has more material on it than the ground it covers.

Two costs sit outside that rate and should always be quoted separately.

Access. Scaffolding, a tower or a mobile platform, at £300 to £600 depending on what the building needs. A single-storey lean-to worked from a tower is at the bottom. A two-storey workshop gable needing a scaffold on three sides is at the top or beyond it.

Disposal. Charged by weight at £0.55 to £0.80 per kilogram. Cement sheet is heavy and a large roof is a real tonnage, so on bigger jobs disposal can be a larger line than the labour.

Anyone giving you a single rate per square metre with no access line and no disposal line has either buried both in the rate or is planning to add them later. Ask which.

The full set of ranges, including the interior materials and survey costs, is on the asbestos removal cost page.

Stripping in sections

Larger roofs come off in sections rather than all at once, and there are three reasons for it.

Weather, first. An open building is a wet building, and cement roofs are often over things that should not get rained on. Sections are opened and closed within the same working period wherever possible, and anything that has to stay open goes under temporary sheeting.

Use, second. A stable block, a workshop or a run of storage units can usually keep working at one end while the other is stripped. Nobody works under a section being removed, but that does not mean the whole building has to shut.

Structure, third. On some older buildings the sheets contribute more stiffness to a tired frame than anyone expects, and taking a whole roof off at once is not always the safe move. Section by section lets the frame be looked at as you go.

What tends to be different on bigger roofs

Roof lights. Corrugated translucent panels are let into most workshop and stable roofs. They are usually GRP, polycarbonate or wired glass rather than asbestos, so they are ordinary waste, but they are fragile and they are the most common fall-through hazard on a roof of this type. They should be on the quote as a separate line.

Condition. A garage roof is usually intact. A twenty-metre workshop roof that has been shedding fragments into the gutters since the 1990s often is not. That matters more than the size, because substantially damaged cement is notifiable non-licensed work and has to be reported to HSE before it starts. It is still work we carry out directly. It just needs the notification, a different method, and honest photographs at quoting stage.

Fixings. Older commercial roofs used hook bolts, crook bolts and sometimes drive screws through the crown, and a proportion will have seized. Cutting rather than forcing is slower and it is what keeps sheets whole.

Cladding. Plenty of these buildings have asbestos cement on the walls as well as the roof, which doubles the material and changes the access. That is asbestos cladding removal and it is usually quoted with the roof as one job.

Measuring it yourself

You can get close enough to a real price with a tape measure and five minutes, and it is worth doing before you ask anyone for a number.

For a pitched roof, measure the length of the building along the ridge, then the slope length from ridge to eaves on one side. Multiply those together and double it for both slopes. Do not use the width on the ground, because the slope is always longer than the span it covers and on a shallow pitch the difference is still ten per cent or more.

For a mono-pitch or a lean-to, it is simply the length times the slope length, once.

Then count the roof lights, because those come off the asbestos area and go onto a separate line. And note the height to the eaves, because that is what decides whether the job needs a tower, a scaffold or neither.

An approximate figure is fine. Nobody is holding you to the tape. What it does is turn a conversation about whether a roof is big or small into a conversation about a number, and it means the range you get back is narrow rather than the width of a barn door.

What the building is used for changes the job

Storage is the simplest case. Everything can be moved or covered, and the roof comes off in whatever sequence suits the weather.

A working workshop is more constrained. Machinery that cannot be moved has to be sheeted and protected, and the phasing works around which end you need. This is normally straightforward and it is normally cheaper than shutting for the duration.

Stables and animal housing need the most planning. Livestock cannot be under or immediately beside a roof being stripped, feed and bedding have to be covered or moved, and the timing usually has to work around turnout. None of that is difficult, and all of it goes wrong if nobody mentions it until the morning.

Anything attached to a house is different again, because the working area is next to living space and the dust control has to account for open windows and a garden that children use.

Farm and equestrian buildings

Stables, field shelters and small barns around Guildford, out towards Shere, Albury, Wonersh and Normandy, are full of cement sheet. Agricultural buildings tend to be larger, more weathered and harder to get a lorry to, and they have their own considerations around livestock and access tracks. Those are covered on the agricultural asbestos removal page.

Around Guildford

The buildings in this category cluster in two places.

Behind the older commercial streets and on the industrial estates, Slyfield in particular, where 1960s and 1970s light industrial units used cement sheet as standard for both roofs and walls. Those are straightforward for access and often large enough that disposal dominates the price.

And on the edges of the town and the villages beyond it, where a workshop, a stable or a long outbuilding sits at the end of a track that a lorry cannot reach. Same roof, considerably more handling.

We cover Guildford and the towns around it. The areas we cover page has each one, including how we get there and what the local waste rules are.

Free, no obligation

Not sure what you are looking at?

Send a photo and a postcode. You get an indicative price back, usually the same day, and a straight answer on whether it is licensed work.

Straight answers

Common questions

How is a larger asbestos roof priced?

By area rather than per building. Asbestos cement removal works out at roughly £50 per square metre as an indicative rate once you are past the size of a single garage. On top of that sit two costs that are quoted separately because they vary enormously. Scaffolding or access equipment at £300 to £600 where the roof cannot be worked safely from below, and disposal by weight at £0.55 to £0.80 per kilogram. A rate per square metre with no access line on it is not a real quote.

Can the building stay in use while the roof comes off?

Usually not underneath the working section, and usually yes elsewhere. Larger roofs come off in sections, so a workshop or a stable block can often keep operating at one end while the other is stripped. What cannot happen is people working or animals standing directly under a roof being removed. Tell us what the building is used for and we will phase it around that rather than asking you to shut for a week.

What if it rains halfway through?

Sections are opened and closed in the same working period wherever the weather allows, and temporary sheeting goes over anything that has to stay open overnight. This is the practical reason larger roofs are stripped in sections rather than all at once. A fully open building is a weather problem and a security problem, and neither is worth the small saving in labour.

Are the roof lights asbestos too?

The corrugated translucent panels let into a lot of workshop and stable roofs are usually not asbestos. They are wired glass, GRP or polycarbonate depending on the era. They are still fragile, still a fall risk, and they still need removing and disposing of, but they are ordinary waste rather than hazardous, so they should show up as a separate line on the quote.

Do you deal with the purlins and the frame?

The frame is a separate question from the sheets and a separate cost. On most buildings of this type the steel or timber frame is sound and gets left in place for a new roof to go on. If the frame has gone, the job becomes a demolition rather than a strip, and the two are priced differently.

Is a large cement roof still non-licensed work?

Area does not change the classification, condition does. Asbestos cement removed carefully without breaking it up is non-licensed work no matter how much of it there is, including weathered but undamaged sheet. Once material is substantially damaged, or the removal will substantially break it up, HSE treats it as notifiable non-licensed work and it has to be reported before it starts. A large roof that has been shedding fragments for years is far more likely to fall on the notifiable side than a sound one.

Keep reading

Related work

Get a price for asbestos roof removal

A photo and a postcode is enough to start. You get an indicative range back, usually the same day.

What we do with your details is set out in the privacy policy.